Asset carried out Geotechnical Investigation of soil and rock conditions for a proposed multi-stage development involving conditions ranging from acid sulfate soils to deep rock excavation. Subsequent investigation was carried out for the existing pavement thickness and composition, including traffic management, services search, characterisation of pavement failure modes, drilling and logging of 13 boreholes, Falling Weight Deflectometer testing, laboratory testing, pavement reinstatement, and engineering assessment and pavement thickness designs.

The project was completed safely, on-time, and within budget, resulting in minimised area of pavement requiring full re-construction.